GMG concludes the implementation process of the All4labels industry
The technical team of GMG has concluded the process of implementing a graphic arts industry in Terrassa that operates under the direction of the German multinational ALL4LABELS. The implementation process, which took place over the course of a year, required the coordinated work of many elements, all of which were directed from their Project Management function by the GMG engineering section.
In the project, solutions have been implemented that turn the new headquarters of this entity into an example of sustainable operation, where parameters such as waste water emissions, VOCs and waste, as well as the consumption of each production line or process.
At a technological level, the center has completely new facilities in which the thermal, electrical, mechanical, control and renewable facilities coexist in total coordination. On this last point, and also directed by GMG, the industry will have a solar photovoltaic self-consumption installation of 400 kW that will be used in the vast majority by the entity, with very specific discharges to the network.
El passat 9 de juny es va realitzar la inauguració de l’activitat amb la presència de l’Alcalde de Terrassa Jordi Ballart, del president regional d’ALL4LABELS i dels més de 100 treballadors de l’empresa.